Foster RBC20-60 Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Nie Foster RBC20-60. Foster RBC20-60 User's Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1

RBC20-60 Blast Chiller

Strona 2 - Introduction

Profiles. You are now in the program profiles. The controller has 9 operating programs – Pre Chill, Soft Chill, Hard Chill, Hard Chill Max, Shock Fre

Strona 3 - Controller Technical Detail

10HARD MAX P14 AIR TEMP °C -20 15 -15 P15 Chill Time MINUTES 5 480 90 P16 CHILL TEMP °C -15 15 3 P17 HOLD TEMP °C -15 15 3 SHOCK FREEZE

Strona 4

11P86 Alarm Buzzer Function NO YES NO P87 Air Probe Offset °K -15 15 0 P88 Coil Probe Offset °K -15 15 0 P89 Food 1 Offset °K -15 15 0 P90 Foo

Strona 5 - This is done with the

12 P13 Change Temp The percentage of a temperature based chill cycle, which is passed before automatically adjusting the air temperature set point

Strona 6

13 P27 Chill Temp Minimum The minimum value that the temperature, which Food Probe 1 must read before the condensing system is de-energised in the

Strona 7

14 P40 Chill Temp Maximum The maximum value that the temperature, which Food Probe 1 must read before the condensing system is de-energised in the

Strona 8 - Service Information

15 P53 Hold Temp Std The standard temperature, which the air probe must read before the condensing system is de-energised in the Hold mode of the Pr

Strona 9

16 Note: The fan 1 hold operation does not effect routine defrost operation. P66 FAN 2 Hold Operation Determines the evaporator fan relay energis

Strona 10

17 NO = No safety door switch fitted. YES = Safety door switch fitted. Note: Usually fitted to the evaporator fan door on Modular Blast Chillers.

Strona 11

NO = No third food probe fitted. YES = Third food probe fitted. P93 Food 3 Offset Allows the value of Food Probe 3 to be offset allowing for the

Strona 12

1Contents Page Introduction 1 to 2 Model Details 2 Controller Technical Detail 2 Parts List 2 Operating Instructions 3 to 6 Electrical Connectio

Strona 13

Foot Print Test operation The foot print test is a method of checking the operation of the process in a reduced time period The foot print test takes

Strona 14

20Technical Data RBC20-60 RBC20-60R Nominal Chilling Capacity 60Kg 60Kg Duty @ -15°C 3800w 3800w Fans 3 3 Evaporating Temperature -15°C -15°C HP

Strona 15

21 EVAPORATOR ASSEMBLY RBC20-60 SERVICE PLATE SYSTEM 1 & SYSTEM 2 PHIALS MUST BE FITTED IN THE HORIZONTAL POSITION AND CORK TAPED FAN PLATE

Strona 16

22 Schematic Dual Circuit Refrigeration Layout CONDENSER - DUAL CIRCUIT COMPRESSOR COMPRESSOR EVAPORATOR – DUAL CIRCUIT SIGHT GLASS SOL. VALVE D

Strona 17

23 COMPRESSOR WIRING RBC20-60

Strona 18 - P91 Food 2 Offset

RBC20-60 1 of 2 Wiring Diagram 24

Strona 19 - Food 3 Offset

RBC20-60 2 of 2 Wiring Diagram 25

Strona 20

RBC20-60R 1 of 2 Wiring Diagram 26

Strona 21 - System 1

27RBC20-60R 2 of 2 Wiring Diagram

Strona 23 - CONDENSER - DUAL CIRCUIT

2The controller will determine the temperature to be maintained during the hold phase based on the chilling cycle that has been completed. If a soft

Strona 26

4 Foster European Operations rance oster Refrigerator France SA el: (33) 01 34 30 22 22 Fax: (33) 01 30 37 68 74 Email: info@fosterfrance.

Strona 27

Blast Chill & Shock Freeze Operating Instructions. Standard Operation When mains electrical power is first applied to the controller it will ca

Strona 28

4Pre Chill This program is used to Pre Chill the cabinet prior to the first cycle. This is done with the Blast Chiller empty and is a short tim

Strona 29

Information Whilst in the program selection screen press and hold the dial for 2 seconds, the information screen will be displayed. Rotate the dial u

Strona 30

6 High Temperature: This alarm will only occur in the hold mode only. Probe the product to determine it is at the correct temperature. If it is at t

Strona 31

Electrical Connections. Inputs. L - Mains ‘Live’ supply (115V 230V, 50Hz / 60Hz). 4 terminals. N - Mains ‘Neutral’ supply – 16 terminals. E

Strona 32 - BC20/SM/0107

Diagnostics Rotate the dial until you reach ‘Diagnostics’, below left, press and release the dial to highlight the component. In this progra

Komentarze do niniejszej Instrukcji

Brak uwag